淺談錦西烏金塘水源凈水廠選址優(yōu)化設(shè)計(jì)
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
簡(jiǎn)介:
關(guān)鍵字:
Design of Wujintang Raw Water Purification Plant in Jinxi
Sun Junhe et al
Abstract: The spot selection of raw water purification plant has to follow the guideline of the general urban plan. Furthermore, in the decision of a reasonable and economical scheme the design will be optimized according to the practi-cal factors such as the distribution of water demand, available equipment, annual power consumption, topographical condition and factors related to communication, operation and construction.0 概述
錦西市(現(xiàn)葫蘆島市)管轄連山區(qū)、葫蘆島區(qū)、南票區(qū)、綏中縣、建昌縣和興城市,總面積10 308km2。目前錦西市的連山區(qū)、葫蘆島區(qū)和龍灣新建城區(qū)的建成區(qū)面積為29.2km2,現(xiàn)狀城市人口23.5萬(wàn)人?,F(xiàn)狀總供水量22.1萬(wàn)m3/d,各大企業(yè)自備水源供水量20萬(wàn)m3/d,市政供水量2.1萬(wàn)m3/d。市政供水人口15.98萬(wàn)人(含部分城郊村民),供水普及率僅為65.2%。
錦西市自從成為省轄市以來(lái),原有的城市基礎(chǔ)設(shè)施已經(jīng)滿足不了城市建設(shè)發(fā)展的需要,城市供水的供需矛盾越來(lái)越突出。根據(jù)測(cè)算:錦西市城區(qū)設(shè)計(jì)當(dāng)年需水量為4.73萬(wàn)m3/d,尚缺少2.63萬(wàn)m3/d;1995年需水6.722萬(wàn)m3/d,缺水4.622萬(wàn)m3/d。為了加強(qiáng)該市城市基礎(chǔ)設(shè)施建設(shè),經(jīng)省政府有關(guān)部門(mén)批準(zhǔn)同意從烏金塘水庫(kù)引水,興建取水、輸水、
該項(xiàng)供水工程的規(guī)模為:取水頭部和輸水管道按7萬(wàn)m3/d(其中2萬(wàn)m3/d原水供給鋅廠)設(shè)計(jì),
1 新建
新建
在地理位置方面:玉皇閣水廠比齊家屯水廠有明顯優(yōu)點(diǎn)。錦西市的城市總體規(guī)劃近期規(guī)劃為連山、龍灣、葫蘆島區(qū)、連灣四個(gè)獨(dú)立組團(tuán)。水廠設(shè)在玉皇閣(座落在連灣區(qū)域內(nèi)),具有用水負(fù)荷分布均勻,水廠與各區(qū)的配水主干線長(zhǎng)度相近,符合城市發(fā)展規(guī)劃要求等優(yōu)點(diǎn)。按照城市規(guī)劃到2000年時(shí),連山區(qū)、龍灣區(qū)、葫蘆島區(qū)用水量分別為2.98萬(wàn)m3/d、2.7萬(wàn)m3/d、2.54萬(wàn)m3/d,而該水廠到以上各區(qū)接管點(diǎn)的干線長(zhǎng)度分別為3.14km,3.01km、2.899km。這種情況對(duì)地勢(shì)較平坦的三個(gè)區(qū)實(shí)行統(tǒng)一供水,可使泵站揚(yáng)程降低,管網(wǎng)壓力比較均勻,不浪費(fèi)能量。而齊家屯水廠至連山區(qū)、龍灣區(qū)和葫蘆島區(qū)的管道長(zhǎng)分別為5.2km、2.70km和3.29km,為解決該市的開(kāi)發(fā)區(qū)供水還需增加1.3km管道。該廠址存在用水負(fù)荷分布不均,且交通不便,通勤車(chē)行車(chē)距離長(zhǎng)等缺點(diǎn)。
在管道工程造價(jià)方面:我們根據(jù)本工程的特點(diǎn),將管道工程劃分為三部分進(jìn)行技術(shù)經(jīng)濟(jì)比較,即笊笠山高地水池到
各供水負(fù)荷區(qū)的配水管網(wǎng)改擴(kuò)建工程是在兩個(gè)方案的相同配水量情況下,對(duì)原有配水管網(wǎng)進(jìn)行必要的管道改造和擴(kuò)建。本設(shè)計(jì)按1995年和2000年兩個(gè)時(shí)期的需水量分別進(jìn)行必要的平差計(jì)算,最后確定1995年期的各廠址方案的配水管道的工程量。其中玉皇閣水廠方案需要改造和新鋪設(shè)DN600~DN150管道累計(jì)長(zhǎng)20.928km,工程造價(jià)500.32萬(wàn)元(不含消火栓和破路面費(fèi),下同);齊家屯水廠方案為DN600~DN150管道累計(jì)長(zhǎng)20.928km,工程造價(jià)498.45萬(wàn)元。兩個(gè)方案配水管網(wǎng)改擴(kuò)建工程量基本相同。
年動(dòng)力費(fèi)用方面:在
表1 錦西新、老水廠泵站泵型選擇方案
廠 址選擇泵型方案號(hào)工況參數(shù)老水廠泵站電機(jī)總?cè)萘?kW年電費(fèi)合計(jì)
/萬(wàn)元控制點(diǎn)號(hào)
及服務(wù)水頭水磊型號(hào)水泵工況玉
皇
閣
水
廠12sh-9A
工作3臺(tái)
ΣN電=465kW一H=51.293m1×10sh-9H=37.323m58055.686④21.33mQ=544.84L/s1×8sh-13AQ=212.056L/s⑤23.46m二H=49.369m2×8sh-13AH=32.785m54552.882④18.78mQ=591.829L/sQ=163.665L/s⑤20.91m12sh-9A
2臺(tái)
12sh-9B
1臺(tái)
ΣN電=445kW三H=48.749m1×10sh-9H=35.649m56052.964④18.91mQ=528.709L/s1×8sh-13AQ=227.018L/s⑤21.04m四H=46.69m2×8sh-13AH=30.698m52549.952④16.40mQ=582.17L/sQ=172.705L/s⑤18.53m齊
家
屯
水
廠12sh-9B
3臺(tái)
ΣN電=405kW五H=43.44m1×10sh-9H=36.21m52048.194④22.09mQ=538.34L/s1×8sh-13AQ=222.12L/s⑤24.23m六H=41.70m2×8sh-13AH=31.29m48545.484④19.81mQ=588.32L/sQ=170.21L/s⑤21.95m12sh-9B
2臺(tái)
12sh-9A
1臺(tái)
ΣN電=425kW七H=45.41m1×10sh-9H=37.50m54050.301④24.0mQ=547.94L/s1×8sh-13AQ=210.42L/s⑤26.14m八H=43.70m2×8sh-13AH=32.82m50547.672④21.83mQ=592.22L/sQ=163.53L/s⑤23.97m說(shuō)明①以上水廠電量、電機(jī)容量均不含葫蘆島地區(qū)的泵容量。②電機(jī)容量中含新、老水廠泵站工作泵電機(jī)容量,不含備用泵。③新、老水廠泵站相距5km,地面高程差為11.6m。
此外,在電力及外線方面,玉皇閣方案比齊家屯方案少3.6萬(wàn)元。玉皇閣水廠廠區(qū)填土需從廠外運(yùn)土8 100m3,造價(jià)4.05萬(wàn)元,齊家屯水廠內(nèi)部土方平整和擋土墻需4萬(wàn)元。廠前道路齊家屯方案比玉皇閣多80m,造價(jià)4.36萬(wàn)元(含征地費(fèi))。齊家屯水廠方案有兩條管道分別穿越五里河、茨山河,故玉皇閣水廠的施工和交通條件都優(yōu)于齊家屯方案。
經(jīng)過(guò)方案的技術(shù)經(jīng)濟(jì)比較可見(jiàn):玉皇閣水廠方案除了地理位置優(yōu)越和交通方便外,僅管道工程就比齊家屯水廠方案節(jié)省一次性投資456.29萬(wàn)元。玉皇閣水廠比齊家屯水廠動(dòng)力費(fèi)高9.474萬(wàn)元,按照國(guó)家有關(guān)規(guī)定管網(wǎng)按7%提取折舊基金,即每年456.29萬(wàn)×7%=31.94萬(wàn)元。建廠投產(chǎn)以后,齊家屯水廠的通勤管理費(fèi)用比玉皇閣水廠高。如果考慮施工期間資金短缺需要銀行貸款的因素,則兩個(gè)水廠廠址方案的經(jīng)濟(jì)比較的差別就更大。因此,設(shè)計(jì)最終選擇了玉皇閣水廠的廠址方案。
2 結(jié)束語(yǔ)
烏金塘水源供水工程于1992年立項(xiàng)、1993年設(shè)計(jì)并施工、1994年全面建成投產(chǎn)。1995年實(shí)現(xiàn)供水4.04萬(wàn)m3/d。1998年供水量達(dá)4.8萬(wàn)m3/d。目前,按照設(shè)計(jì)選址的新建凈水廠二泵站和原凈水廠二泵站同時(shí)向市區(qū)管網(wǎng)供水。兩座泵站的機(jī)組工況都能處于高效段工作。玉皇閣凈水廠1 000m3水電耗為293kW . h。
△作者通訊處:110005遼寧省城鄉(xiāng)建設(shè)規(guī)劃設(shè)計(jì)院
電話:(024)23867643 23214754
李彬 葫蘆島市建委
- 1[廣東]高層住宅樓安全文明施工示范工地檢查匯報(bào)(豐富圖片)
- 2紹興市梅山公園規(guī)劃探析
- 3造價(jià)工程師案例分析復(fù)習(xí)要點(diǎn):窩工取費(fèi)的索賠
- 4一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):場(chǎng)區(qū)水準(zhǔn)點(diǎn)
- 5再生骨料混凝土基本性能分析與研究
- 62015年招標(biāo)師考試《法律法規(guī)》重要試題解析匯總
- 72015年監(jiān)理工程師《進(jìn)度控制》每日一練(7.22)
- 82015年二級(jí)建造師《施工管理》每日一練(7.29)
- 9五星酒店摔一跤吃住全免 男子半年里摔6次
- 10國(guó)有企業(yè)加強(qiáng)企業(yè)文化建設(shè)的途徑
- 11建筑工程施工項(xiàng)目管理中如何做好信息管理系統(tǒng)的應(yīng)用?
- 1209年監(jiān)理工程師《建設(shè)工程合同管理》命題精髓(30)
- 13德商項(xiàng)目小運(yùn)河大橋懸臂梁中跨順利合攏
- 14在不良地質(zhì)地段中開(kāi)挖,應(yīng)遵守哪些原則?
- 152015年一級(jí)建造師考試知識(shí)點(diǎn):安全生產(chǎn)許可證的管理
- 162015造價(jià)工程師考試土建備考資料:地下工業(yè)工程布置
- 17自落式攪拌機(jī)工作部位切勿投入砂石
- 182015年招標(biāo)師考試多選試題樣題及答案
- 19生產(chǎn)安全事故調(diào)度統(tǒng)計(jì)報(bào)告范圍
- 20新型城鎮(zhèn)化引擎點(diǎn)燃綜合試點(diǎn)方案 62城鎮(zhèn)試點(diǎn)
- 21非均勻沙起動(dòng)的非線性尖點(diǎn)突變模式
- 22滬寧高速公路橋涵通用圖高速公路涵洞參考圖
- 23一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):剪應(yīng)力
- 24投標(biāo)保證金的收取比例是多少
- 25二級(jí)建造師考試《建筑工程管理與實(shí)務(wù)》模擬試題(十九)
- 26IT企業(yè)項(xiàng)目組合選擇過(guò)程與方法研究
- 27礦院建筑館雨季施工方案
- 28建筑工程裝飾裝修施工工藝標(biāo)準(zhǔn)(四項(xiàng))
- 29鐵路運(yùn)輸安全監(jiān)控與檢測(cè)技術(shù)主要有鐵路列車(chē)檢測(cè)、鐵路列車(chē)超速防護(hù)和什么
- 30現(xiàn)澆連續(xù)梁鋼管支架的計(jì)算及施工
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓