1. overlapping activities on a project, such as design and construction, is referred to as:
a. fast tracking
b. risk conversion.
c. parallel management.
d. process improvement.
e. synchronous manufacturing來源:考試大網(wǎng)
ans: a
2. the major reason why a project manager would use written instead of oral communication is:
a. documentation
b. feedback
c. cost
d. barrier elimination
e. all of the above.
ans: a
3. the scope management provides:來源:考試大網(wǎng)
a. a basis for future decisions about the project.
b. a baseline to accomplish verification measures.
c. a baseline to evaluate potential scope changes.
d. all of the above.
e. b and c only.
ans: d
4. total project risk can be defined as:
a. the sum of the probabilities of project risks events times the sum of consequences of those risks
b. the sum of the products of each project risk event times its consequences
c. the sum of the consequences of all project risk events
d. the sum of the probabilities of all project risk events
e. 1 - the sum of the probabilities of all project risk events.
ans: b
5. which of the following statements about the cost of quality are true?
a. the cost of quality is the expense of nonconformance to requirements and specifications.
b. the cost of quality are mostly the direct responsibility of workers who are manufacturing the product.
c. quality control programs should be implemented when the cost of quality are deemed affordable by management.
d. a and b.來源:考試大
e. a and c
ans: a
6. a line manager who is asked to wear two hats and function as a project manager at the same time is likely to exercise:
a. authority
b. power
c. influence
d. all of the above]
e. a and b only
ans: d
7. including the customer in the process of project planning is:
a. slow and counterproductive.
b. essential in the definition and documentation of project goals.
c. necessary, but of limited value.
d. unnecessary because project goals are defined in the proposal stage.
e. none of the above.
ans: b
8. it is argumentative whether project managers actually control costs. which of the following is the most common element over which the
project manager may have some degree of control?
a. direct labor dollars
b. direct labor hours.www.Examda.CoM
c. overhead rates.
d. procurement costs.
e. none of the above.
ans: b
9. most quality problems:
a. originate in the quality department where the ultimate responsibility for quality rests.
b. originate on the shop floor because of waste and product rework.
c. are the results of management inattention to potential quality improvement ideas.
d. could be eliminated if shop supervisors monitored their work more closely.
e. a and b
ans: c
10. the "buy or make" decision is usually made during the:
a. acquisition cycle
b. contract evaluation cycle
c. requirements cycle
d. pre-award cycle
e. at any time that is convenient for the project manager
ans: c
11. the logical relationship that communicates a delay between the start/finish of one activity and the start/finish of another activity is referred to
as:
a. slackwww.Examda.CoM
b. free float.
c. restricted float.
d. level float.
e. lag
ans: e
12. which of the following actions is an example of risk response:
a. adjust project parameters (scope, time, quality ...)
b. reduce the probability of potential project risk events
c. reduce the consequences of potential project risk events
d. wait until a problem actually happens, then deal with it in the most effective and efficient manner.
e. a, b and c only
ans: e
本站推薦
- 1PMP項目管理進(jìn)度系統(tǒng),能否讓您的項目一馬當(dāng)先?答案當(dāng)然是肯定的!
- 2項目進(jìn)度管理有難題?PMP系統(tǒng):一問就知,輕松解決
- 3PMP項目管理,項目進(jìn)度管理的疑問終結(jié)者,您還在等什么?
- 4項目進(jìn)度難掌控?PMP管理系統(tǒng):疑問解答,效率倍增!
- 5PMP項目管理進(jìn)度系統(tǒng),能否讓您的項目效率翻倍?答案就在這里!
- 6項目進(jìn)度滯后?PMP管理系統(tǒng):一問就知道怎么加速!
- 7項目管理不再迷茫,PMP進(jìn)度系統(tǒng):您的疑問我來答
- 8PMP在手,項目進(jìn)度管理難題還用問嗎?輕松搞定
- 9還在為項目進(jìn)度頭疼?PMP管理系統(tǒng)幫您一問解千愁!