QUEST The Risk of NOT meeting project quality objectives:
A can be minimized through continuous monitoring.
B considered a long term risk.
C will be reflected in the "in-service" life of the product or service.
D B and C
E All of the above.
參考答案:E
QUEST The "zero defect" concept was proposed by:
A Deming
B Juran
C Crosby
D Tagushi
E A and D only
參考答案:C
QUEST The use of quality circles:
A has proven ineffective in both Japan and the U.S.
B is particularly effective in overcoming labor/management conflicts.
C provides a quick fix for most quality problems.
D allows workers the opportunity to generate solutions for chronic quality problems.
E A and B only
參考答案:D
QUEST In a flowchart, the diamond form is used to represent:
A a starting point.
B an operation.
C a written report.
D a decision point.
E an end point.
參考答案:D
QUEST In a fishbone diagram, the effect you are concerned about is placed:
A at the right-hand end of the spine.
B at the end of the diagonal line (i.e. "fin").
C on a branch of a fin.
D at the left-hand end of the spine.
E None of the above.
參考答案:A
相關(guān)試題:
2010年P(guān)MP美國項(xiàng)目管理考試習(xí)題及答案六十六
試題推薦:
2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選1
2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選2
2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選3
本站推薦
- 1高速公路項(xiàng)目部2010年度業(yè)務(wù)代表述職報(bào)告
- 2廣西六欽高速某標(biāo)段2010年度施工進(jìn)度計(jì)劃
- 3貴新高速公路粗苯泄漏的應(yīng)急監(jiān)測
- 4交通部試驗(yàn)檢測師:交通安全設(shè)施測試題(2010年度)
- 5交通部試驗(yàn)檢測工程師:橋涵工程試驗(yàn)檢測試題(2010年度)
- 62010年公路工程試驗(yàn)檢測師考試復(fù)習(xí)資料
- 7交通部試驗(yàn)檢測師:公路、材料測試題(2010年度)
- 82010年一級建造師考試模擬題及復(fù)習(xí)大綱
- 92010年全國一級建造師執(zhí)業(yè)資格考試模擬試題(含答案)