2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案七十五
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
QUEST Which of the following is based on an individual identification with a more powerful person.
A expert power
B reward power
C referent power
D A and B.
E A and C
參考答案:C
QUEST Which of the following results are Win/Win conflict resolution?
A compromising
B forcing
C problem solving
D smoothly
E withdraw
參考答案:C
QUEST Which of the following organizations has the best technical project control?
A matrix
B functional
C projectized
D B and C
E A and B
參考答案:D
QUEST The functional organization is effective with a mature product or single product line.
A TRUE
B FALSE
C參考答案:
D參考答案:
E參考答案:
參考答案:A
QUEST The strong matrix versus a weak matrix.
A team members are more likely to be assigned to the project office in a strong matrix
B strong matrix is more difficult to manage.
C the balance of power has shifted away from the PM.
D functional managers no longer has control over the technical processes.
E All of the above.
參考答案:A
相關(guān)試題:
2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案七十四
試題推薦:
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選1
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選2
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選3
本站推薦
- 1高速公路項(xiàng)目部2010年度業(yè)務(wù)代表述職報(bào)告
- 2廣西六欽高速某標(biāo)段2010年度施工進(jìn)度計(jì)劃
- 3貴新高速公路粗苯泄漏的應(yīng)急監(jiān)測(cè)
- 4交通部試驗(yàn)檢測(cè)師:交通安全設(shè)施測(cè)試題(2010年度)
- 5交通部試驗(yàn)檢測(cè)工程師:橋涵工程試驗(yàn)檢測(cè)試題(2010年度)
- 62010年公路工程試驗(yàn)檢測(cè)師考試復(fù)習(xí)資料
- 7交通部試驗(yàn)檢測(cè)師:公路、材料測(cè)試題(2010年度)
- 82010年一級(jí)建造師考試模擬題及復(fù)習(xí)大綱
- 92010年全國(guó)一級(jí)建造師執(zhí)業(yè)資格考試模擬試題(含答案)